Installation and setup preparation – GBC Stl1000 User Manual

Page 5

Advertising
background image

4

.

KEEP HANDS AND LOOSE CLOTHING AWAY FROM ALL MOVING PARTS.

1. Installation and setup Preparation

Use this section to properly unpack ,set into place, and setup the STL1000.

1.1 Inspect the shipping container for any visible damage while the trucking company is still

there . If you see any damage, file a damage claim with that trucking company immediately .
Otherwise you may be responsible for any needed repairs.

1.2 Remove the cardboard slip cover and dispose of in accordance with local regulations.
1.3 Cut the banding material securing the output conveyor to the shipping skid. Remove

conveyor from shipping skid and move to the location where the STL1000 is to be located
in your facility .

1.4 There are four bolts securing the STL1000 to the shipping skid (REF. FIG. 1A). These

bolts are located one in each foot pad of the STL1000. Use a ¼” Allen wrench to remove
these bolts and discard.

1.5 Locate the orange colored foot pedal secured to the shipping skid. Remove the fasteners

that secure the foot pedal to the skid and discard fasteners. Place foot pedal on the table
top of the STL1000 . CAUTION: Make sure the foot pedal will not fall off the table
top. It may damaged by falling.

1.6 Refer to fig._1A_ for fork lift points of the STL1000. Using a fork lift with a lift capacity of

700kg/2000lbs. , lift the STL1000 from the shipping skid and transport it to the operating
location.

1.7 Have your electrician hook up the appropriate power requirements. Refer to section 3 of

this manual to find the right requirements for your machine CAUTION DO NOT
APPLY POWER TO THE STL1000 !!
A GBC technician will check to insure proper
power is present when installation is scheduled . YOU WILL VOID YOUR
WARRANTY IF YOU APPLY POWER.

1.8 You will need to supply compressed air to the STL1000. Refer to section 3 of this manual

for minimum air requirements . A quick connect is supplied on the air regulator located on
the rear of the machine..

1.9 Be sure that you have TWIN LOOP WIRE and enough prepunched books to run your

machine for at least one hour . Please contact your sales representative if you have any
supply needs.

1.10 Contact GBC National service to schedule a technician to complete your installation.