Loading film onto the supply shafts, Operating instructions – GBC 27C User Manual

Page 20

Advertising
background image

Operating Instructions

Page 6-4

27C

L

OADING

F

ILM

O

NTO

THE

S

UPPLY

S

HAFTS

If you are replacing existing films, perform the
following first set of instructions,

To remove existing

films. If you are loading film for the first time,
skip these instructions and start with the next
instructions,

To load films.

Fig. 6-5. Roller Pressure Handle.

Fig. 6-6. Release Liner Take-up and Supply Films on the

Machine.

To remove existing films:

Put the roller pressure handle to Release.

Cut the remaining top and bottom films just
ahead of the pressure rollers. Do not allow the
remaining film to pass through the laminator
if there is any exposed adhesive. Pull the
remaining film out the front of the machine.


CAUTION:
Be careful to not cut the pressure rollers.
Failure to observe this notice can result in damage to
the rollers.

Remove the release liner from the take-up core
by doing the following.

Grasp the take-up shaft and push it to
the left and lift the right end upward and
out of the support.

Unwind or cut the liner from the core. Do
not damage or throw away the core.

Put the shaft, with the core, back on the
machine by inserting the left end (hex
end) in the left side of the drive and, while
pushing to the left, lower the bearing into
the right side of the machine.

To remove the film core shaft, grasp the supply
shaft, press it to the right until the left end of the
hex shaft clears the brake hub, and raise the left
end of the shaft out of the machine. Do this for
the top and bottom supply shafts.

Slide the core off the shaft and core adaptors.
Tip: Twist the shaft while pulling to remove the
core easier.

Clean the pressure rollers if needed. See the
Operator Maintenance chapter in this manual.

1.

2.

3.

a.

b.

c.

4.

5.

6.

Advertising