To load films onto the supply shafts:

If the supply shaft is on the machine, remove it
by grasping it, pressing it to the right until the left
end of the hex shaft clears the brake hub, and lift
the left end out of the machine. This applies to
the top and bottom supply shafts.

Slide the new roll on to the shaft and core
adaptors, referring to Fig. 6-3. to determine how
the film unwinds from the roll. Use the set screws
in the core adaptors to move the adaptors if
needed. The grippers on the core adaptors
should be pointing in the opposite direction that
the film unwinds from the roll.

Fig. 6-7. Core Adaptors on the Shafts.

Fig. 6-8. Direction of Core Adaptor Gripper on Poly-in Film.

1.

2.

Insert the bearing end of the shaft into its
support on the right side of the machine, press
to the right, and then insert the left end of the
hex shaft into the brake hub.

Center each supply roll on the shafts by doing
the following.

Use a ruler to measure from the left edge of
the roll to the left side frame.

Do the same on the right side.

Shift the roll side to side so that both
measurements are equal. It is important that
the edges of the films are aligned so that
adhesive does not get on the rollers.

Center the take-up core on its shaft.

Fig. 6-9. Films Loaded on the Laminator.