Tweco 6000GST Cutting Systems User Manual

Page 20

Advertising
background image

INSTALLATION

3-2

Manual 0-2690

2. Remove the tape securing the shield of the torch leads

to the leads.

3. Unfold the shield towards the end of the leads.

4. Feed the Control Cable through the boot on the end of

the Arc Starter Box.

5. Feed the torch leads through the boot on the torch end

of the Arc Starter Box.

A-01775

Torch Leads

Hose Clamp

Shield Braid

Torch Leads

Shield Assembly

(Brass Hub)

Control Cable

Figure 3-2 Hose Clamp

6. Feed the Control Cable and torch leads through the

supplied Hose Clamp.

7. Connect the Control Cable to the mating connector on

the Center Chassis.

Control Cable

Control Cable

Connector

A-01774

Figure 3-3 Control Cable Connection

8. Connect the torch leads connectors to the bulkhead

connections per the following figure.

A-01776

Torch Leads

Secondary Gas

Plasma Gas

(Left-Hand Thread)

Coolant Supply

Coolant Return

(Left-Hand Thread)

Pre-Flow (N2)

Gas

Figure 3-4 Torch Leads Connections

9. Pull the shielding braid towards the end panel as far as

it will go up and over the brass hub. The hub is part of
the Boot Assembly and provides the grounding point
for the shielding in the torch leads.

NOTE

The shielding braid must not make contact with
the four mounting studs.

Torch Leads

Shield Braid

Torch Leads

Shield Assembly

(Brass Hub)

A-01777

Mounting

Stud

Figure 3-5 Shield Braid Installation

Advertising