OPERATION

Post-flow delay allows gases to flow after the main
cutting arc is interrupted. Post-flow is factory-set at
10 seconds, but can be reset to 5, 20, or 40 seconds.

Post-Flow Time

(Seconds)

SW4-1

Position

SW4-2

Position

5

0 (Off)

1 (On)

10 *

0 (Off)

0 (Off)

20

1 (On)

0 (Off)

40

1 (On)

1 (On)

* = Factory Setting

E. OK-To-Move Selection (SW5)

SW5

A-00995

Logic

PC Board

Figure 4-12 OK-To-Move Selection Switch SW5

Location

The OK-To-Move Selection Switch (SW5) selects ei-
ther contact closure or 24 VAC for the OK-To-Move
signal (motion start).

OK-To-Move Selection

SW5

Contact Closure *

UP

24 Vac

DOWN

* = Factory Setting

To use the contact closure for the OK-To-Move sig-
nal the switch should be in the up position (factory
setting). To use 24 VAC for the OK-To-Move signal
the switch should be in the down position.

When starting off the edge of the workpiece, not a
pierce start, jumper TB2-8 to TB2-9 and TB2-7 to
TB2-10 to give an OK-To-Move contact closure when
the pilot starts via pilot sensing relay (PSR). The
switch must be in the contact closure (up) position or
the 24 VAC will be shorted out and blow the internal
fuse (f3).

24VAC

J2-19

J2-18

J15-11

J15-10

SW5

OK-To-Move

J2-16

J2-14

Logic PCB

OK-To-Move

At Pilot

Initiation

PSR

TB2-10

TB2-9

TB2-8

TB2-7

A-01009

Figure 4-13 OK-To-Move Using Internal Supply

An external voltage source up to 120V may be con-
nected in series with the Pilot Sensing Relay (PSR)
or OK-To-Move. This also works with the RC6010,
refer to RC6010 Manual for 24 VAC or external volt-
age. RC6010 must have only contact closure from
the Power Supply.

J15-11

J15-10

External Voltage

Source Alternate

Positions

OK

PSR

TB2-10

TB2-9

TB2-8

TB2-7

A-01010

Figure 4-14 OK-To-Move Using External Supply