7 auxiliary connections – Tweco PAK 15XC User Manual

Page 30

Advertising
background image

INSTALLATION PROCEDURES

26

Manual 0-2251

Remote Operator Control

Panel Installation

The Remote Operator Control Panel consists of the control
panel enclosure and cables required for connection.

1. Connect the control cable to the receptacle marked

REMOTE (J15) on the rear panel.

2. Connect the other end of the control cable to the

receptacle marked PS (J37) on the remote operator
control panel enclosure.

1. Connect the interface cable to the receptacle marked

CNC (J29) on the remote operator control panel.

2. Connect the other end to the customer-supplied mo-

tion control device (refer to Appendix IV, CNC Inter-
face).

The SC-5 Standoff Control consists of a control panel, an
electronic unit, a voltage divider board, a torch lifter
motor, and cables required for installation (refer to Figure
3-G). It is ordered and shipped separately and must be
installed according to the SC-5 Standoff Control Instruc-
tion Manual, which is included with the SC-5 unit.

Refer to the High-Flow Water Shield Instruction Manual
and:

1. Connect the high-flow starter control cable to the

receptacle marked HI-FLOW WATER SHIELD on the
power supply rear panel. The receptacle is 115VAC to
activate the high-flow water shield.

2. To shut off the high-flow water shield remove the

control cable or disconnect power to the high-flow
water shield unit.

3.7 AUXILIARY CONNECTIONS

Computer Control Interface

Installation

SC-5 Standoff Control

Installation

High-Flow Water Shield

Installation

Advertising