Tweco PakMaster 75XL Plus (CE) User Manual

Page 21

Advertising
background image

Manual 0-2782

3-5

INSTALLATION

Retaining Nut

Strain Relief

Torch Leads

Assembly

A-02836

Figure 3-5a Torch Strain Relief Nut (Leads with

Two Control Wires)

Strain Relief

Nut

Strain Relief

Torch Leads

Assembly

A-03607

Negative /
Plasma Lead

Pilot Lead

Figure 3-5b Torch Strain Relief Nut (Leads with

Four Control Wires)

4.

Feed the torch lead ends and the Strain Relief into
the hole in the unit.

5.

Secure the Strain Relief with the retaining nut re-
moved earlier.

6.

Connect the torch Negative/Plasma Lead to the
bulkhead connection inside the Power Supply.

Adapter

(Supplied With
Power Supply)

Pilot Lead

Torch Lead

Assembly

Negative/Plasma

Lead

Adapter

Connector

Pilot Lead Stud

Negative/Plasma Lead

Connection

A-02825

Control (PIP) Circuit

Connectors

Figure 3-6a Torch Lead Connections (Leads with

Two Control Wires)

Pilot Lead

Torch Lead

Assembly

Negative/Plasma

Lead

Adapter

Connector

Pilot Lead Stud

Negative/Plasma
Lead Connection

A-03608

Note: Actual Bulkhead
configuration may
differ from that shown.

Adapter

Control Circuit

Connectors

Figure 3-6b Torch Lead Connections (Leads with

Four Control Wires)

7.

Connect the Control Cables to the mating connec-
tors on the Adapter supplied on the Power Sup-
ply.

Advertising