04 preparations for operating, 04 preparations for operating -5 – Tweco PakMaster 75XL Plus (CE) User Manual

Page 33

Advertising
background image

Manual 0-2782

4-5

OPERATION

4.04 Preparations for Operating

Follow this set-up procedure each time the system is op-
erated:

WARNING

Disconnect primary power at the source before dis-
assembling the power supply, torch, or torch leads.

A. Torch Parts Selection

Check the torch for proper assembly and appropriate front
end torch parts. The torch parts (shield cup, tip and elec-
trode) must correspond with the type of operation (cut-
ting or gouging). Refer to the Instruction Manual sup-
plied with the Torch Assembly for proper parts selection.

B. Check primary power source as follows:

1. Check the power source for proper input voltage.

Make sure the input power source meets the power
requirements for the unit per Section 2.03-A, Specifi-
cations/Design Features.

2. Connect the input power cable (or close the main dis-

connect switch) to supply power to the system.

C. Gas Selection

Select desired gas (air or nitrogen). Make sure gas source
meets pressure and flow requirements (refer to Section
3.08, Gas Connections). Check connection and turn gas
supply on.

D. Work Cable Connection

Check for a solid and clean work cable connection to the
workpiece. The area must be free from paint and rust.

Make a solid work cable
connection to the work-
piece or cutting table

A-00925

Figure 4-7 Work Cable Connection To Workpiece

E. Torch Connection

Check that the torch is properly connected.

F. Power Supply On

Move the ON/OFF switch to ON position.

G. Select Output Current

Select the desired current output level for the operation:

• 15 to 60 amps for standoff cutting and gouging

• 15 to 35 amps for drag cutting

NOTE

At output settings over 35 amps, the power sup-
ply automatically reduces output current to 35
amps if the torch tip touches the workpiece.

H. Set Operating Pressure

Move the RUN/SET/LATCH switch to SET position. Ad-
just the gas pressure to 60 - 75 psi (4.1 - 5.2 bar). Refer to
the Torch manual for specific pressure settings.

I.

RUN/SET Switch

Set the RUN/SET/LATCH switch to RUN position.

The system is now ready for operation.

NOTE

For general cutting, use the RUN position which
provides normal touch operation where the torch
switch must be held throughout the main arc trans-
fer.

For specific applications, use the LATCH position
where the torch switch can be released after the main
arc transfer. The torch remains activated until the
main arc breaks from the workpiece.

Advertising