03 sequence of operation, 03 sequence of operation -3 – Tweco PakMaster 75XL Plus (CE) User Manual

Page 31

Advertising
background image

Manual 0-2782

4-3

OPERATION

4. Optional Filters

a.

Single-Stage Air Filter Assembly

This in-line filter removes moisture and contaminants
from the air stream when using compressed air. The
filter is capable of filtering to at least 0.85 microns.

1

2

3

4

A-02965

Figure 4-5 Rear Panel Showing Optional Single-

Stage Air Filter

b.

Two Stage Air Line Filter

This optional filter will also remove moisture and con-
taminants from the air stream when using compressed
air. Filters to 5.0 microns.

A-01152

1

3

4

2

Figure 4-6 Rear Panel Showing Optional Two Stage

Air Filter

4.03 Sequence of Operation

The following is a typical sequence of operation for this
cutting system. Refer to Appendix 2 for a block diagram.

1.

Close main power source disconnect.

a. AC power is available at the Power Supply.

2.

Place RUN/SET/LATCH switch to RUN mode.

3.

Place the ON/OFF power switch on the front panel
of the Power Supply to ON.

a. AC Power indicator blinks ON and OFF for

eight seconds then stays ON.

b. Fans turn on.