07 primary input power cable connections – Tweco PakMaster 75XL Plus User Manual

Page 19

Advertising
background image

Manual 0-2746

13

SECTION 3: INSTALLATION PROCEDURES

Voltage Selection

Connector

380/415 Volts

460 Volts

208/230/240 Volts

A-00911

Voltage Selection

Label

Figure 3-2 Input Voltage Selection

2. For three-phase 460VAC input, the jumper wire be-

tween L2 and L2 (storage) must be left in this storage
connection.

For single-phase operation the jumper wire must be
installed on the contactor as described in Section 3.07
for single-phase input voltage.

3.07 Primary Input Power Cable

Connections

Units ordered as 230V, single-phase, will have a six foot
power input cable and plug factory installed. For all other
units, a cable must be provided by the end user. Recom-
mended cable sizes are specified in Appendix I.

1. Route the primary power cable through the strain re-

lief fitting in the rear panel of the Power Supply and
tighten strain relief screws.

AC Input Power

Cable Strain Relief

AC Input

Power Cable

A-00912

Figure 3-3 AC Input Power Cable Strain Relief

2. Connect the input cable inside the Power Supply for

the type of operation per the following:

Three-Phase Operation

Three-phase operation requires a 3-conductor cable
with ground.

a. Locate the ground stud and remove the top nut

and washer.

b. Install a lug terminal on the ground wire.

c. Place the ground wire onto the ground stud

and secure with the nut and washer.

d. Insert the other three wires into the L1, L2, and

L3 terminals on the contactor.

e. Tighten all set screws.

NOTE

The jumper wire from L1 to L4 must not be re-
moved.

L1

L2

L3

Input
Contactor

AC Input
Power Cable

GND

Unused Jumper
L3 to L3 (storage)

A-02670

Figure 3-4 Primary Power Cable Connections -

Three-Phase Operation

Advertising