Tweco PCM - 102 Machine Torch User Manual

Page 40

Advertising
background image

SERVICE

5-8

Manual 0-2818

A-03546

Pilot Lead

Insulation Sleeving

Figure 5-8 Insulation Sleeving Position for the Pilot

Connection

6. Reconnect the two torch head wires to the mating

connectors in the leads assembly.

7. Place the Torch Head Assembly in the handle shell

halves keeping in mind the following:

• Place the Torch Head Assembly switch leads

so that no connectors or wires extend beyond
the edge of the handle.

• Allow sufficient slack in the leads to avoid pull-

ing the leads tightly around the edge of the
handle.

• Position Pilot Lead under the Negative /

Plasma Lead.

• Position the Pilot Lead so that the screw will

not penetrate the Insulation Sleeve when the
handle halves are reassembled.

NOTE

For safety reasons, do NOT use the sleeving if it is
damaged during reassembly. Replace sleeving if
damaged.

8. Place the torch handle halves together and install

the five assembly screws as follows:

a. Insert the two screws at the Torch Head end

of the Handle and torque to 15 in-lbs.

b. Insert the two screws at the Torch Lead end of

the Handle and torque to 15 in-lbs.

c. Insert the center screw and torque to 15 in-lbs.

d. Check the Torch Trigger for proper operation.

It should move freely and not bind. If the trig-
ger binds, loosen the center screw only until
the Trigger moves freely.

A-02824

Handle Half

#1

#2

#3

Install Screws In

Sequence Shown

Figure 5-9 Torch Handle Screw Installation

9. Install the front end torch parts.

C. Removing Hand Torch Control Switch

To remove the Torch Control Switch Assembly re-
quires gaining access to the switch wiring and par-
tial disassembly of the torch handle per the follow-
ing procedure:

1. Remove the five screws from the Torch Handle

Assembly. Pull the halves apart and set aside.

A-02823

Handle Screws

(Five Places)

Handle Half

Figure 5-10 Torch Handle Screw Removal

Advertising
This manual is related to the following products: