Preparation, Fiber optic cable installation, Gas control module cover – Tweco 9-9435 User Manual

Page 2: Do not remove, 23 circuit board, Fiber optic cable

Advertising
background image

March 6, 2006

2

Manual 0-4738 Rev. AA

Preparation

1. Remove the screws securing the cover panel to

the Module.

2. Remove the Cover from the Module.

Art # A-07287

COM

M

J57

J56

INPUTS

TVA

PO

WER

SUPPL

Y

H35

AIR

N

2

O

2

Gas Control Module Cover

SHIE

LD

PLA

SMA

PRE

FLO

W

H2O

SHIELD

H2O

Do not remove

Fiber Optic Cable Installation

1. Remove the securing nut from the through-hole

protector supplied on the cable. Pass the cable
and the through-hole protector into the hole in
the connection panel on the back of the mod-
ule. Fasten the through-hole protector in place
with the securing nut. Do not tighten the pro-
tector.

2. Pass the fiber-optic connector through the hole

in the connection panel. Pass enough of the
cable into the Module to let the cable loop up-
ward as shown.

CAUTION

Avoid kinking, twisting, or bunching the fiber-
optic cable. The cable can be damaged by being
forced into tight-radius turns.

2

3

Circuit Board

Art # A-07285

Fiber Optic Cable

CO

MM

PLASMA

OUT

PREFLO

W

OUT

J57

J56

SHIELD

OUT

H

2

O

INPUTS

TVA

PO

WER

SUPPL

Y

H35

AIR N

2

O

2

1

3. Insert the fiber-optic cable connector into the

receptacle on the vertically-mounted circuit
board as shown.

Advertising