1.4 Electrical Preparation

1.4.1 Conduit Installation

A typical installation will require 3 conduit runs for, power, data and wash control
lines. DO NOT run data wires in the AC Power or Wash Control conduits. Additional
conduit runs may be needed when a gate or the Portal RFID option are to be used.
Conduit size should be at least ¾ in, a larger conduit may be required depending on
the quantity and gauge of wires to be installed. Refer to local and national electrical
codes to select the proper conduit type and size. Figure 4 provides guidelines for
conduit planning.

Figure 4. Conduit Runs

To ensure the conduit sections will be located within the Portal base and not interfere
with the base frame, they should be routed so the stubs can be contained within the 4
inch square areas shown in the Figure 5.