Field operation – Great Plains NTA2007HD Operator Manual User Manual

Page 65

Advertising
background image

Great Plains Manufacturing, Inc.

Contents

Index

Operating Instructions

61

04/04/2011

Contents

Index

166-283M

Field Operation

Perform all steps in “Pre-Start Checklist” on page 29
and “Final Field Checklists” on page 60.

Null4:

Seed Monitor

The seed monitor performs the following functions:

• Drill lift switch monitoring

• Seed flow blockage

• Fan Speed monitoring

• Hopper material level monitoring

• Hopper air pressure monitoring

• Meter rate monitoring

(seed rate control, optional)

• Ground speed monitoring

Consult the DICKEY-john

®

Air Cart Control manual for

how to configure reporting and alerts.

Null4:

Do not make short radius turns with the drill in the ground.

Null4:

Note: If you stop in the middle of a pass, raise the drill

and back up 3m (10 ft) before resumption of seed-
ing.

Null4:

Null4:

Equipment Damage Risk:
On a new drill, check and adjust hopper strap tension before
and after each material load on the first day, then daily there-
after. Loose straps can result in excess meter oscillation as
hoppers near empty.

First Pass Operation Checklist

Page

1. Drill unfolded and aligned for first pass,

with opener disks about 3m (10ft) before
field edge.

30

2. Run fan for at least 15 minutes before

planting.

3. Unfold marker on next-row side.

4. Set fan hydraulic circuit to low flow,

engage circuit. Gradually adjust fan
hydraulic flow to obtain 3800 rpm.

82

5. Check seed monitor for alerts.

a

6. Pull forward, lower air drill, and begin

planting for a short distance.

7. Stop. Assess:

• coulter depth

• planting depth

• press wheel operation

8. Make necessary adjustments

64

a.

Refer to Seed Rate manual.

Sharp Field Turns Checklist

Page

1. Fold marker

58

2. Raise air drill

37

3. Make turn

4. Unfold marker on next-row side.

58

5. Lower air drill 3m/10ft before field edge

36

6. Resume planting.

Suspending Planting Checklist

Page

1. Stop tractor

2. Fan hydraulic circuit to Float or Neutral

58

3. Fold Marker

58

4. Raise air drill

37

Ending Planting Checklist

Page

1. Suspend operations as above, then

2. Lift implement

3. Set tractor for fold

33

4. Fold wings

33

5. Lower implement to obtain lock

36

6. Lights ON for transport

Advertising
This manual is related to the following products: