Meter drive adjustments, Row unit adjustments – Great Plains 8030P G1022 Operator Manual User Manual

Page 23

Advertising
background image

20

Section 3 Adjustments

60303P and 80303P Three-Point Planter 401-008M-A

5/2/07

Great Plains Mfg., Inc.

Meter Drive Adjustments

The meter clutch and meter-input shaft must be aligned.
Misalignment will cause meter malfunction and excessive
meter-housing wear. Periodically check vertical and hori-
zontal alignment of meter clutch and meter-input shaft.

Refer to Figure 3-5.

1.

Latch hopper onto hopper support.

2.

Check that roll pin (1) in end of the meter-input shaft is
centered. When centered, equal amounts of the roll
pin will protrude from both sides of the shaft.

3.

Rotate meter-input shaft so that roll pin is vertical.

4.

Rotate the drive coupler (2) on meter clutch so that the
slots are vertical.

5.

Release meter clutch to engage meter-input shaft.

6.

If shafts are aligned vertically, the drive coupler will en-
gage with meter-input shaft freely and the roll pin will
extend equally on each side of the drive coupler. Dis-
engage the clutch and repeat steps, checking for hor-
izontal alignment.

Figure 3-5

Vertical Alignment

7.

If drive coupler does not freely engage meter-input
shaft vertically or horizontally, loosen 5/16-inch nuts
(3) shown in Figure 3-5. Engage meter clutch. Align
meter clutch with meter-input shaft.

8.

Tighten 5/16-inch nuts to torque values listed on
Torque Values Chart, “Appendix,” page 39.

17891

Row Unit Adjustments

Down Pressure
Springs provide the down pressure necessary for opener
disks to open a seed trench. The springs allow the row unit
to float down into depressions and up over obstructions.

You can adjust down pressure individually for each row
unit. Use only enough down pressure to cut the seed
trench and maintain proper soil-firming over seed. Exces-
sive down pressure will lead to premature wear on row-
unit components.

To adjust, lift T-handle shown in Figure 3-6.

Move T-handle back to increase spring pressure.

Move T-handle ahead toward tractor to decrease

spring pressure.

Figure 3-6

Row Unit Spring Adjustment

Refer to the charts below for the amount of spring pres-
sure at the opener for each spring setting.

Down Pressure Charts

Medium-Duty Spring Package

Pounds Pressure

First Holes (Closest to Tractor)

85

Second Holes

100

Third Holes

115

Fourth Holes

135

Fifth Holes (Closest to Hopper)

155

Heavy-Duty Spring Package

Pounds Pressure

First Holes (Closest to Tractor)

155

Second Holes

175

Third Holes

205

Fourth Holes

225

Fifth Holes (Closest to Hopper)

245

17718

Advertising
This manual is related to the following products: