Figure 5 tubing through brace plate, Figure 6 tubing at coulter fitting, Figure 7 completed grease bank plate – Great Plains 3P605NT Assembly Instructions User Manual

Page 3

Advertising
background image

Great Plains Mfg., Inc.

Installation Instructions

3

09/25/2006

151-125M

Refer to Figure 5.

6.

Starting at the Grease Bank, pull one end of the
nylon tubing

from near the panel to the left-most

coulter pivot.

Route the tubing along the inside of the top frame
tube, and through the forward hole in each brace
plate.

Avoid kinks and sharp bends in the tubing. Route it
away from sharp objects and moving parts of the
machine.

Continue to route the tubing down to the fitting adap-
tor

at the left-most coulter pivot.

Figure 5

Tubing Through Brace Plate

Refer to Figure 6.

7.

Connect the end of the tube

to the fitting adaptor

at the coulter pivot. Press the tubing into the fitting

until it connects.

8.

At Grease Bank plate

, cut the tubing

at the

plate, allowing some slack.

9.

Loosen the compression nut of the fitting

lowest

zerk. Do not completely remove the nut, or the com-
pression fitting may rotate out of alignment, or fall out
and be lost. Insert tube into compression fitting and
tighten.

Figure 6

Tubing at Coulter Fitting

Refer to Figure 7.

10. Working from machine left to right, repeat this pro-

cess for each coulter hub.

Note: One hole in the bank plate is unused.

11. When all coulters have been tubed, secure the bun-

dle with the ties

(not shown). Trim excess tie tabs.

Figure 7

Completed Grease Bank plate

25097

25098

25099

Advertising
This manual is related to the following products: