Air brakes assembly – Great Plains TCN5313 Assembly Manual User Manual

Page 26

Advertising
background image

22

TCN5107-5313

Great Plains Manufacturing, Inc.

566-170Q-ENG

03/17/2014

Refer to Figure 23

Air Brakes Assembly

126.Start by installing the air/hydraulic booster plate

to

the plate on inside of RH truss with 3/8 x 1 hex bolts

, 3/8 lock washers and 3/8 nuts. Attach the air/

hydraulic booster

to the outside of air/hydraulic

booster plate

, using 5/16 x 1 hex bolt,

5/16 lock

washer and 5/16 nut.

Note: See “Install Rebound Valve and O-Ring Fit-

tings” on page 14 for proper fitting installation.Be
sure the brake spindle assemblies were installed
with the brake cylinder towards front of machine.

127.Install the copper gasket

and invert flare fitting

into rear of the air/hydraulic booster

.

128.Mount the flare brass fitting with tab

to the center

plate with two holes, with 5/16 x 1 hex bolt

, 5/16

lock washer and 5/16 nut.

129.Now route the three 1/8” dot brake lines

. Fasten

into fittings as shown. Fasten brake lines up along
frame close to where the hydraulic hoses go. Fasten
brake lines along back of frame tube and along
torque tube gussets where the holes are drilled using
3/8 hose clamps

with 5/16 x 1 hex bolt

, 5/16

lock washer and 5/16 nuts.They need to be fastened
with the cable ties

as needed.

130.Mount the tank brackets

with 1/2 x 4 1/32 x 7 1/4

u-bolts

, 1/2 lock washers and 1/2 nuts. Attach the

air tank

and emergency relay valve plate

to the

top side of the tank brackets with 7/16 x 1 1/4 hex
bolts

, 7/16 lock washers and 7/16 nuts.

131.Install brass plugs

, 3/4 pipe plug

to rear of

tank and petcock

to bottom of tank.

132.Attach brass fitting

, brass nipple

, adapter

and emergency valve relay

to front of tank.

133.Attach adapters

to both sides (3 total) of relay

valve. Fasten adapter

to front of relay valve.

Attach brass plug

into lower left adapter

. Install

brass fitting

into upper adapter

. Attach the 3/8

brass fitting

in the brass fitting

.

134.Fasten one of the brake filters

to the 3/8 brass fit-

ting

. Fasten other brake filter

to front side of

other filter with 5/16 x 3 1/2 hex bolts

, 5/16 lock

washers and 5/16 nuts.

135.Now attach the five, 3/8 x 3/8 brass elbows

to

locations shown in drawing. Attach two 1/2 x 1/2 fit-
ting

to the air line holder. Attach three 1/2 x 3/8

brass fittings

to locations shown.

136.Run the 3/8 nylon brake line

as shown. Cut each

piece to length needed. Be sure to hook into the cor-
rect fittings.

137.Attach the 3/8 air coil hose (blue)

, to top 1/2 x 1/2

fitting

. Fasten the air gladhand (blue)

to other

end of blue hose. Repeat the same procedure for the
3/8 air coil hose (red)

and air gladhand (red)

to

the lower 1/2 x 1/2 fitting

.

138.Attach the two gladhand storage holders

to the

air line holder, with 5/16 x 1 hex bolt

, 5/16 lock

washer and 5/16 nut.

Note: Be sure brake lines are secured to where they

won’t get pinched when raising machine up and
down.

139.Attach wheel chock holders

(optional) to plates

on front outside tube of center frame with 1/2 x 1 1/2
hex bolts

, 1/2 lock washers and 1/2 nuts.

140.Slide wheel chocks

onto pegs of wheel chock

holders

, secure with chain fasteners

.

141.Clean area and place wheel chock decals

on

angle tube beside wheel chock holders

.

142.Tighten all bolts to specs, See “Torque Values

Chart” on page 27.

1

2

3

1

4

5

6

3

7

4

8

9

4

10

11

12

13

14

15

16

17

18

19

20

21

22

21

23

24

21

25

21

26

25

27

26

27

28

29

32

33

31

33

32

34

35

36

32

37

4

38

39

40

38

41

42

38

Advertising
This manual is related to the following products: