Center gang bar – Great Plains 4000TM Assembly Manual User Manual

Page 34

Advertising
background image

30

3500-4000TM

Great Plains Manufacturing, Inc.

586-537Q-ENG

12/03/2013

Center Gang Bar

Note: Refer to center gang bar assembly in “Parts Man-

ual” for correct part numbers of all components.
Refer to machine layout drawings in this manual
for correct gang assembly placement.

Refer to Figure 23
90. Position gang assemblies

in proper locations.

Install the gang pivot bolt

through tubes of gang

bars and tubes on center frame, secure with 1 1/4
flat washers

(one on top and one on bottom), 1 1/

4 slotted nuts

(one on top and one on bottom).

Tighten bolts snug, torque to 350 to 400ft-lbs. Install
the 3/16 x 2 cotter pins

through 1 1/4 slotted nuts

and bend over to secure.

Note: Be sure turnbuckle assembly

is preset at 91”

before installing as shown. See gang angle adjust-
ment in “Operator Manual” before going to field.

91. Install turnbuckle assembly

, adjustable end on ear

on front of rear gang bars and fixed end on ear of
front gang bars. Secure with 1 x 3 1/4 clevis pin

,

1.5 x 1.00 x 0.075 machine washer

and 3/16 x 2

cotter pin

.

92. Install the round tubes

between bottom front

plate

(slotted hole toward rear), rear plates

and

plates on center frame. Install the 3/4 x 6 hex bolts

, 3/4 lock washers and 3/4 nuts. Attach other end

of plates

to bottom of center frame with 3/4 x 2

hex bolts

and 3/4 lock washers.

93. Install bracket

on bottom side of gang bar plate,

secure with 5/8 x 3 1/2 hex bolts

, 5/8 lock wash-

ers and 5/8 nuts.

94. Now the gang cylinders

may be hooked up with

the 1 x 3 1/8 clevis pin

, 1.5 x 1.00 x 0.075

machine washer

and 3/16 x 2 cotter pin

.

95. Bolts may be tightened to specs, See “Torque Val-

ues Chart” on page 46 and all cotter pins may be
bent.

1

2

3

4

5

4

6

6

7

8

5

11

9

10

12

10

13

14

15

16

17

8

5

Advertising
This manual is related to the following products: