Assembly and setup assistance, Product support pre-assembly checklist, Introduction – Great Plains 4000TT Operator Manual User Manual

Page 15: Pre-assembly checklist

Advertising
background image

Great Plains Mfg., Inc.

Table of Contents ►

Introduction

1/25/2008

Series I 1000TT- 4000TT Turbo-Till 586-043M

13

Assembly and Setup Assistance

To order additional copies of operator’s and parts
manuals, write to the following address. Include
model numbers in all correspondence.

If you do not understand any part of this manual
or have other assembly or setup questions, assis-
tance is available. Contact

Product Support

Great Plains Mfg. Inc.

PO Box 5060

Salina, KS 67402-5060

Pre-Assembly Checklist

• Before assembling, read and understand “Im-

portant Safety Information,” beginning on
page 1.

• Have at least two people on hand while as-

sembling.

• Make sure assembly area is level and free of

obstructions (preferably an open concrete ar-
ea).

• Have all major components.
• Have all fasteners and pins shipped with

Series I Turbo Till.

• IMPORTANT: If a pre-assembled part or fas-

tener is temporarily removed, remember
where it goes. Keep the parts separated.

• Have a copy of the parts manual on hand. If

unsure of proper placement or use of any part
or fastener, refer to the parts manual.

Check that all working parts are moving free-
ly, bolts are tight, and cotter pins are spread.

Advertising