Transport locks, Wing fold, Pre-leveling of machine – Great Plains 4000TC Operator Manual User Manual

Page 24: Front to rear leveling

Advertising
background image

20

1200-4000TC

Table of Contents

Index

Great Plains Manufacturing, Inc.

586-239M

Table of Contents

Index

08/01/2012

Transport Locks

Refer to Figure 7

11. Once the cylinders are connected, raise the unit com-

pletly. If the transport locks

are in place, remove them

at this time.

12. Store the transport locks

in hole of the lift mechanism

link.

Wing Fold

Refer to Figure 8

13. If wing stop pins

are installed remove pins from wing

stop clevis

.

14. Install pin in storage tube

on wing stop.

15. Once the transport locks and wing stop pins are

removed, unfold the wings (if folding unit).

Note: Make sure no one is under the wings during the unfold-

ing process. Watch for leaks and make sure hoses do
not get pinched during the initial unfolding process.

16. Once the machine is unfolded, raise and lower the

machine several times to purge air from the lift system.
Again, watch for any leaks and tighten if necessary.

Pre-Leveling of Machine

Note: Pre-leveling of machine should be done on a good level

surface.

Front to Rear Leveling

Refer to Figure 9

17. Lower machine so front coulters gangs are 1-2” off of

ground. Loosen jam nut

with turnbuckle wrench

(stored on center tube pegs of hitch). Adjust the turn-
buckle

at the front of machine to level it front to back.

(Shorten to bring front down, extend to bring front up).

18. When the front coulter gangs are the same distance off

ground as rear coulter gangs retighten jam nut

.

Figure 7

Transport Locks

42066

1

2

1

2

Figure 8

Wing Fold Pins

42067

1

3

2

1

2

3

Figure 9

Hitch Turnbuckle Adjustment

41073

2

3

1

1

2

3

1

Advertising