Planting – Great Plains YP2425F-2470 Operator Manual User Manual
Page 44
Advertising

40
YP2425 & YP2425F
Great Plains Manufacturing, Inc.
401-406M
2014-07-14
Planting
When all checklist items are complete, a planting pass
normally consists of a few simple steps)
1.
Lower planter mainframe
2.
Extend a marker
3.
Drive forward
4.
Scan monitors and controls. Check for errors, alerts
and out-of-limits events. Check planting rate reports.
5.
Raise marker
6.
Raise planter mainframe
7.
Turn
8.
Extend marker as needed for next pass
9.
Subsequent Passes resume at step 1.
When reloading seed and fertilizer, check consumption
against anticipated use to that point.
Figure 38
Planting
26044
Advertising
This manual is related to the following products: