Assembly, Tools required, Pre-assembly checklist – Great Plains 3P-FF900 Predelivery Manual User Manual

Page 9

Advertising
background image

Assembly 7

11/09/2006

500-643Q

Assembly

The following headings are step-by-step instructions for
assembling the Front Fold 3-Point Sprayer. Begin with
Tools Required and Pre-Assembly Checklist to make
sure you have all necessary parts and equipment. Then
proceed with Unload Sprayer from Truck. Follow each
step in order to make the job as quick and safe as possi-
ble and produce a properly working machine.

The Front Fold 3-Point Sprayer is shipped via flat bed
truck. It is the dealer’s responsibility to unload the
sprayer. Unload all equipment before beginning assem-
bly. Do not attempt any assembly work with the Front
Fold 3-Point Sprayer on the truck.

Tools Required

• General hand tools

Pre-Assembly Checklist

1.

Read and understand “Important Safety Informa-
tion
” on page 1 bef
ore assembling.

2.

Have at least two people on hand while assembling.

3.

Make sure the assembly area is level and free of
obstructions (preferably an open concrete area).

4.

Have all major components.

5.

Have all fasteners and pins shipped with boom.

IMPORTANT !

If a pre-assembled part or fastener is temporarily
removed, remember where it goes. Keep the parts
separated.

6.

Have a copy of the parts manual on hand. If unsure
of proper placement or use of any part or fastener,
refer to the parts manual.

7.

Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.

8.

Check that safety labels and reflectors are correctly
located and legible. Replace if necessary. Refer to
Safety Decals in the “Important Safety Informa-
tion
” chapter of the operator’s manual.

Advertising