Great Plains 3SF45 Operator Manual User Manual

Page 2

Advertising
background image

4/8/99

0-1

170-062M

DEALER PREPARATION CHECK LIST

PREDELIVERY

Before delivering machine the following check list should be completed. Use this Owner’s Manual as a guide.

1.

Assembly completed.

2.

Fluids added & checked.

3.

All grease fittings lubricated. Refer to "

Maintenance & Lubrication

" section.

4.

Check & tighten all hardware. Refer to "

Nut & Bolt Torquing Chart

".

5.

All decals are in place & readable. See "

Decal Placement

" section.

6.

All safety shields or guards are in place.

7.

Overall conditions good {i.e. paint, welds}.

170-062M
Effective 4/8/99

DELIVERY

Review this Owner’s Manual with the customer. Explain the following & check off as completed.

1.

Safety procedures for operation & service.

2.

Basic operating & adjustments.

3.

Daily & periodic maintenance & lubrication. Refer to "

Maintenance & Lubrication

" section.

4.

Correct lubricants & usage.

5.

Great Plains parts & service.

6.

Record serial number. See "

Introduction

" on next page.

7.

Remind customer that all decals should remain in place & readable. See "

Decal Placement

" section & con-

tact dealership for replacements when needed.

8.

Remind customer that

ALL

safety shields & guards are not to be removed.

9.

Give customer this Owner’s Manual & encourage them to read it.

This check list is to remain in Owner’s Manual.

It is the responsibility of the dealer to complete the procedures listed above BEFORE delivery of this
machine to the customer.

Advertising
This manual is related to the following products: