Transportation and installation, 3 installation, 1 delivery – Great Plains DTX300 P16315 User Manual

Page 15: 2 transportation

Advertising
background image

15

DTX 300

Operating Instructions

2.3 Installation

When carrying out installation and
maintenance work there is a higher risk of
injury. It is important that you familiarise
yourself with the machine and read the
Operating Instructions beforehand.

Operator instruction and initial installation of
the machine are carried out by our service
technicians or authorised distributors.

The machine must not be used in any way
beforehand! The machine can only be
released for operation after instructions have
been provided by our service technicians or
authorised distributors.

• If any modules or parts have been removed
for transportation, these shall be mounted by
our service technicians/authorised dealers
before the instruction takes place.
• Check all important screw connections!
• Lubricate all nipples and joints!

2. Transportation and

Installation

Transportation and initial installation of the
machine are described in this chapter.

2.1 Delivery

The machine is normally delivered, fully
assembled.

• The machine can be lifted off with a crane
or other suitable lifting equipment.

• The machine should be hitched to a tractor
and driven off a low-loader.

2.2 Transportation

The DTX 300 can be transported on public
roads by hitching it up to a tractor or on a low-
loader.

• It is important to observe the permitted
dimensions and weights when transporting the
machine.

• If the machine is transported on a trailer or a
low-loader, it must be secured using straps
or other devices via the designated tie down
points on the machine..

• Before transporting the machine on public
roads, it must be adjusted to its transportation
position and the stipulations relating to road
transportation fulfilled.

• The maximum permissible speed is 25 km /h.

2. Transportation / Installation