Pre-delivery closeout, Stow spacers, Stow documents – Great Plains NP3000A Predelivery Manual User Manual

Page 31: Remove pre-assembly markings, Final inspection

Advertising
background image

03/31/2011

Table of Contents

Index

407-613Q

Great Plains Manufacturing, Inc.

Table of Contents

Index

27

Pre-Delivery Closeout

Stow Spacers

1.

Select two sets:

810-242C STROKE CONTROL SPACERS 1 1/8

2.

Clip each set around the wire loop

on each of the

two lift-assist mounts.

Stow Documents

Place all documents in the Manual-Pak™

1

.

Remove Pre-Assembly Markings

Remove all part tags. Wipe off all grease pencil part
numbers.

Final Inspection

1.

Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.

2.

Check that all grease fittings are in place and lubri-
cated. See “Lubrication and Scheduled Mainte-
nance
” in the Operator manual.

3.

Check that all safety decals and reflectors are cor-
rectly located and legible. Replace if damaged. See
Safety Decals” in the Operator manual.

1. Manual-Pak™ is a trademark of Custom-Pak, Inc.

Figure 40

Lift-Assist Spacers

31636

53

2

53

2

Advertising
This manual is related to the following products: