Field set-up checklists, Field operation, Short-term parking – Great Plains YP40F Operator Manual User Manual

Page 25: Long-term storage

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

21

2013-03-25

Table of Contents

Index

403-362M

Field Set-Up Checklists

Add the following items to the basic planter checklists, or
any customer checklist you have developed.

Field Operation

The YP24 DF/seeder feature requires no changes to the
checklists in the 401-406M Operator manual, the YP40
DF/seeder requires no changes to the checklists in the
401-571M Operator manual.

When the fan is running, and the planter is lowered and
in forward motion, material is applied from the fertilizer
hopper at the currently set rate.

Consult seed monitor for blockage alarms.

When reloading fertilizer, check consumption against
anticipated use to that point.

Short-Term Parking

The YP24 or YP40 DF/seeder feature requires no
changes to the Parking steps in the 401-406M or
401-571M Operator manual.

Long-Term Storage

The YP24 or YP40 DF/seeder feature adds the following
steps to the storage recommendations of the 401-406M
or 401-571M Operator manual:

• Perform a seeding system clean-out (page 35)

• Close the lid of the seed hopper firmly, making sure it

is fully latched (page 11).

• Clean-out the fertilizer air system and hopper

(page 35).

• Tie the clean-out and calibration doors partly open

(page 35).

• Close, but do not tightly seal the fertilizer hopper lid

(page 12).

Equipment Damage Risk:
Perform a fertilizer clean-out when the planter is left unused
for more than 36 hours. Fertilizer is generally very corrosive.
If fertilizer or residue is allowed to remain in the hopper or
meter, exposed metal surfaces will be attacked. See “Material
Clean-Out
” on page 35.

Mechanical Checklist (Hitching)

Page

No changes

Electrical Checklist

Page

No changes

Hydraulic System Checklist

Page

No changes

Mechanical Checklist (post-Hitching)

Page

No changes

Planter Meter Drive Checklist

Page

Check fertilizer ground drive and gearbox
output chain lubrication and slack

39

Check final Range gears set for desired
High or Low range

23

Check setting of variable rate gear box
against chart or calibrated rate.

24

No changes for seeding

Air System Checklist

Page

Fan butterfly valves set for fertilizer

19

Fertilizer loaded. Lid closed.

12

No air leaks in fertilizer system

Hoses and tubing - no sags, no pinches

Hoses fully connected to applicators

Row Units Checklist

Page

Check frame-mounted coulter:
offset
angle
depth

29

Check applicator height.

29