Install Magnets

Front Page

Part Lists

Great Plains Manufacturing, Inc.

3

2013-08-27

Front Page

Part Lists

116-284M

Install Magnets

Apply the instructions for “Tube Install” (step 10) or
“Shaft Face Install”
(step 17 on page 4) for each
mounting position.

Shaft Face Install

If the location has a polymer tube over the shaft,
continue at “Tube Install” on page 4.

10. De-grease and dry the shaft

.

11. Using the calibration crank or other means to rotate

the shaft so that two faces are at vertical, and two
are horizontal.

Refer to Figure 4

12. Select one new:

540017 MAGNET, ADHESIVE BACKED, LARGE

13. Before removing the release backing, check that the

magnet

fits. If it does not fit, trim it as required,

keeping it longer than the minimum length specified
in the “Notes:” on page 2.

14. Remove the release backing film. Aligning with the

shaft center-line (and to the extent possible, in the
center of the cup-to-cup gap), apply the adhesive
side of the magnet to the shaft.

Refer to Figure 5

15. Select two new:

770026 CABLE TIE

(These are the smaller ties)

Loosely install the ties

at each end of the magnet,

so that when finally tightened, the ratchet end of the
tie will be on the shaft face opposite the magnet

.

Position the ties so that the ends of the magnet are
exposed by at least dimension:

1

4

inch (6 mm).

Tighten the ties.

16. Continue with the next magnet location at step , or if

all magnets are installed, at “Drill Mounting Holes”
on page 5.

Figure 4

Magnet on Shaft

34212

3

27

3

27

27

Figure 5

Magnet Secured by Ties

34212

27

29

29

a

29

29

27

a

Advertising
This manual is related to the following products: