Installation, Flush the pump, Disconnect boom line – Great Plains Discharge Elbow Kit Hypro Pumps User Manual

Page 2: Caution

Advertising
background image

Great Plains Mfg., Inc.

2

Discharge Elbow Kit

407-189M

03/01/2007

Installation

Flush The Pump

1.

Move the implement to a location suitable for flush-
ing the fertilizer system, such as the field most
recently fertilized.

2.

Refer to the implement Operator’s manual, and flush
the fertilizer system with water (or if freezing
weather is possible before next use, with RV anti-
freeze).

3.

If necessary, move the implement again, to a dry
well-lighted location suitable for disassembly.

4.

Raise and unfold the implement. Lower it, or if you
prefer to leave it raised, install lift cylinder locks.

5.

Secure the tractor.

Disconnect Boom Line

!

CAUTION

Because the discharge line usually exits upward from the
pump, it is almost certain to contain a significant amount of
fluid. Wear appropriate protective gear and ensure that the
resulting spillage is contained, such as with a bucket under
the pump.

Refer to Figure 2

6.

Loosen the:

CLAMP WRM DRV #16 SS (.68-1.5)

and disconnect the:

HOSE 1 ID 200PSI EPDM.

Save these components.

7.

Loosen the adaptor stack

attached to the dis-

charge elbow

.

Remove and save it the adaptor stack.
It is not necessary to further disassemble the
stack.

Figure 2

Disconnect Discharge Line

26104

51

52

53

1

52

53

1

51

Advertising