Hydraulic assembly, Assembly – Great Plains FCP1000 Assembly Instructions User Manual

Page 3

Advertising
background image

3

5/25/06

CP1000 & FCP1000 Folding Markers 148-449M

Great Plains Mfg., Inc.

Assembly

Hydraulic Assembly

1.

Remove hoses from elbows in tongue cylinder. Lay hoses
aside for later reinstallation.

2.

Remove existing cylinder gauge from tongue cylinder. Dis-
card gauge.

Refer to Figure 2.

3.

Mount selector valve (1) on new cylinder gauge (2) using
3/8" x 2 3/4" bolts, flat washers, lock washers and nuts pro-
vided. Position selector valve as shown.

4.

Install new cylinder gauge on tongue cylinder.

5.

Mount sequence valve (3) on sequence-valve mount (4).
Secure valve on mount with 3/8" x 1" bolts and lock washers
provided.

6.

U-bolt sequence-valve mount on hitch at location shown.
Position sequence valve so four ports point to the rear of the
implement and two ports face the tractor. Secure u-bolt with
1/2" nylock nuts.

7.

Install elbows with 9/16" outlets (5) in marker-cylinder ports.

8.

Use hydraulic hose stamped "811-180C" to connect base
ends of marker cylinders to sequence valve. Connect hose
from left-hand cylinder (6) to port R1. Connect hose from
right-hand cylinder (7) to port R2.

9.

Use hydraulic hoses stamped "811-309C" to connect rod
ends of marker cylinders to sequence valve. Connect hose
from left-hand cylinder (8) to port C1. Connect hose from
right-hand cylinder (9) to port C2.

10. Install elbows with one 9/16" outlet and one 3/4" outlet (10)

in left-hand ports in selector valve. Install remaining elbows
with 3/4" outlets (11) in remaining ports in selector valve.

11. Use two remaining hoses stamped "818-180C" (12) to con-

nect left-hand ports on selector valve to sequence valve.

12. Use hoses stamped "811-272C" (13) to connect right-hand

ports in selector valve to tongue cylinder.

13. Connect hoses removed from tongue cylinder in step one

(14) to top ports on selector valve.

Figure 2

Marker Hydraulic Assembly

17876

Advertising