Assembly – Great Plains Blockage Monitor Assembly Instructions User Manual
Page 2
Advertising
2
Air Drill Blockage Monitor 168-258M
4/8/04
Great Plains Mfg., Inc.
Assembly
2.
On each module connector panel,
set rotary switch marked S2 AD-
DRESS. Set rotary switch on far left
module to 1, rotary switch on second
module from left to 2 and so forth.
Continue until each module is set to
a unique address.
3.
In each secondary seed hose to be
monitored, use a die grinder to make
a 1/2-inch hole in top of hose near
seed-distribution tower.
NOTE: Do not use a drill bit to make
holes in secondary seed hoses. Using a
drill bit will damage the seed hose.
4.
Gather enough sensors for hoses to
be monitored on far-left tower. Using
marking chalk, number sensors in
sequential order.
18093
18090
18091
Advertising