Assembly – Great Plains Blockage Monitor Assembly Instructions User Manual

Page 4

Advertising
background image

4

Air Drill Blockage Monitor 168-258M

4/8/04

Great Plains Mfg., Inc.

Assembly

9.

Connect one module to monitor
head. Connect three wires from
monitor head to three pins on right-
hand side of connector panel. Match
data input/output, ground and +12
volt wires to DATA, GND and +12V
pins.

10. Connect all other modules to each

other, connecting the data, +12 volt
and ground wires to the matching
pins on each connector panel. Con-
nection order between modules is
not critical.

18094

18095

Advertising