Purging Hydraulic System

Refer to Figure 19

73. Charge the lift system first. Extend the lift cylinders

(black handles) until the center section is fully raised.
Remove the cylinder transport locks

and store on lift

straps

. Raise and lower the lift system several times to

purge air from system. Retract and extend the gang sys-
tem

(Red Handles) several times to purge air from sys-

tem. Watch for leaks and retighten fittings if necessary.

74. You may now charge the fold system. Before charging the

fold cylinders

, make sure the rod end of the cylinders

(model 4000 will have two fold cylinders on front on both
sides of machine) are un-bolted or un-pinned and block is
placed under cylinders as shown, so that when the rod is
extended, it will clear the wing fold brackets. Extend the
fold cylinders

(green ends) completely and then close

them. Extend and retract the cylinders several times to
purge air from the system.

75. Now the rod end of fold cylinders

may be hooked up to

wing with the 1 x 3 1/8 usable pin

, 1.5 x 1.0 x.075

machine washer and 3/16 x 2 cotter pin. Bend cotter pin
over to secure.

Figure 19