Carrier assembly for 24p drill – Great Plains 2410P Assembly Instructions User Manual

Page 3

Advertising
background image

4/9/2004

113-742M

Great Plains Mfg., Inc.

3

Installation Instructions

Carrier Assembly for 24P drill

To assemble carrier onto drill frame, refer to Figure 3.

1.

Assemble transport-carrier mount (1) on drill
frame. Center mount 46 1/2inches from outside
end of drill frame. Use 1/2 x 6 1/32 x 7-inch u-
bolts (2), flat washers, lock washers and hex nuts
(3). Slide mount forward so its leading edge is
about 2 1/4 inches ahead of front edge of drill
frame tube.

2.

Bolt transport carrier (4) to transport-carrier
mount so top surface of saddle (5) is about
29 1/4 inches above top of drill frame tube. Se-
cure transport carrier with 1/2 x 2 x 3-inch
u-bolts (6), lock washers and hex nuts (7).

3.

After installing and bleeding hudraulics, trans-
port carrier may require further adjustment.
When folded, the second marker section should
rest in the transport-carrier saddle..

Figure 3

Carrier Assembly

19208

Advertising
This manual is related to the following products: