Installing marker hydraulics – Great Plains 2410P Assembly Instructions User Manual

Page 4

Advertising
background image

113-742M

4/9/2004

Great Plains Mfg., Inc.

Marker Option

4

4.

After installing and bleeding hydraulics, trans-
port carrier may require further adjustment.
When folded, the second marker section
should rest in the transport-carrier saddle.

Figure 4

Needle Valve Assembly

17642

Installing Marker Hydraulics

Without Sequence Valve
Refer to Figure 4.

1.

Install elbow fittings (1) in cylinder ports.

2.

At rod end of each cylinder, install an adaptor
(2) into elbow fitting. Install a needle valve (3)
in adaptor.

3.

Connect hydraulic hoses to fittings and route
hydraulic hoses to tractor outlets. Route hy-
draulic hoses through transport-carrier mount
at cutout. Use black cable ties to secure hy-
draulic hoses to drill frame.

4.

Using orange cable ties, secure a plastic hose
label, see Figure 5, to each pair of hydraulic
hoses near tractor outlets.

5.

Proceed with "Bleeding Marker Hydraulics"
on page 5.

Figure 5

Hose label and cable tie

17641

Plastic hose
label

Cable tie

Advertising
This manual is related to the following products: