Yield-pro® planter, Model # ____________ serial – Great Plains DICKEY-john AI-120 User Manual

Page 2

Advertising
background image

In order to plant, the following steps are required:
1.) Check that correct seed discs are present in meter.
2.) Check that seed gates at Y-splitters are all open for seed delivery.
3.) Check that no foreign matter is present in air box, then open hopper door.
4.) Turn on fan and set oil flow to get XXXXRPM.
5.) Check that Marker/Fold switch is set to “marker” even if you do not have them.
6.) Fill meters with seed by performing “Row Fill”, and waiting 2 minutes.
7.) Check that correct seed and target population is set on monitor/controller.
8.) Perform “Fill Disk” to avoid leaving a skip when starting. If fan is stopped for any
reason, then repeat this step.
9.) For hydraulic drive planters, turn on channel to enable meter operation. Valve
calibration is strongly recommended.
10.) Pull forward and lower planter to begin planting. If there is a delay before starting to
plant, you will need to re-enable seed meter drive due to safety delay.

YIELD-PRO® PLANTER

Model # ____________

Serial # ____________

Configurations

4 – Hyd. Drive 5 – Grd. Drive 6 – Air-Pro® 7 – Row-Pro™ 9 – Swath Command™

Level 2 Access

Unit has been configured at factory and operated with these configurations.

Material Configuration - Population Split-Air Target Rate Row-Pro Target Rate Swath Command Setback

1. ______ _______ ________

2.

2012-12

2

401-909M

Advertising