Dell UPS 1920R User Manual

Page 31

Advertising
background image

31

Installation

|

NOTE:

For Europe, the emergency switch requirements are detailed in Harmonized document HD-384-48 S1,

“Electrical Installation of the Buildings, Part 4: Protection for Safety, Chapter 46: Isolation and Switching.”

REPO Connections

Wire Function

Terminal Wire Size Rating

Suggested Wire Size

REPO

L1

4–0.32 mm

2

(12–22 AWG)

0.82 mm

2

(18 AWG)

L2

NOTE:

The pins must be open to keep the UPS running. If the UPS shuts down because the REPO connector

pins are shorted, restart the UPS by re-opening the REPO connector pins and turning on the UPS manually.
Maximum resistance in the shorted loop is 10 ohm.

NOTE:

Always test the REPO function before applying your critical load to avoid accidental load loss.

Remove Jumper if

installed

Figure 29. REPO Connector

To install the REPO switch:

1

Verify that the UPS is off and unplugged.

2

Remove the REPO connector from the accessory kit.

NOTE:

Verify that there is no jumper installed in the REPO connector. If a jumper is installed, remove it before

connecting to the REPO port.

3

Connect the REPO connector to the REPO port labeled “IN” on the UPS rear panel.

4

Optional.

If you are daisy-chaining the REPO function with another UPS, you can shut down the

entire system using a single switch.

Connect the second REPO connector to the REPO port labeled “OUT.”

Advertising