Part 1 site preparation, A. location and layout – Chamberlain Swing GATE User Manual

Page 6

Advertising
background image

Rev C

Doc 6001242 (01-20273)

5 of 53

PART 1

SITE PREPARATION

A.

LOCATION AND LAYOUT

Figure 1. Gate Operator Layout Options.

NOTES

• Left Gate and Right Gate are determined by looking from inside the complex toward the street.
• Figure 1 shows a typical Bi-Parting gate in standard and compact installations.

1. Always install gate operators inside of the fence line, NEVER on the public side of the fence.
2. Mount all manual controls and activating devices at least 6 ft. away from the gate for safety.
3. Allow enough clearance around the gate and the gate operator for installation and service.

Advertising