Quality assurance checklist – Cleveland Range (T) MKDL-125-T (-CC) User Manual

Page 7

Advertising
background image

The following will be performed before the unit is connected to utilities:

1. Visual

Examine unit for scratches, dents, or other defects.

2. Visual

Check flanged feet all have bolts holding them.

3. General

Check all accessible wiring, mechanical and plumbing connections by hand for
secure, tight and satisfactory assembly. Remove all paper.

4. Level

Check unit has been leveled and squared correctly.

The following will be performed with the unit connected to utilities:

5. Raise Bridge

If bridge does not raise then check motor rotation. Bridge should not raise until
speed control is turned to minimum and then adjusted back up.

6. Swing Bridge

Bridge when fully raised should swing without hitting any object, i.e. control
housing, kettle lip. Check that hydraulic hoses are not being pinched by stops
on swivel assembly.

7. Tilt Kettle

Kettle tilts smoothly both down and back up. If power tilt, check that micro
switches are adjusted properly (kettle is level in upright position and drains fully
when tilted) and are not being crushed by gear.

8. Lower Bridge

Raise bridge. Switch to mix. Turn speed control to zero to reset micro switch then
set speed control to number four. Check that unit does not begin to mix until
bridge has lowered part way into the kettle. Check that mixer bridge pin lowers
into pin hole correctly

9.

Speed Control -

Main agitator arm not rotating when set at minimum but will start to move slowly on

Main

one. Speed control makes positive contact with micro switch.

10. Speed Control -

Set main speed control to five. Adjust secondary control from

Secondary

minimum to maximum. Look for considerable speed variance.

11. Water Faucets

Turn on hot water faucet. Turn off and check for leaks in piping and drips from
faucet spout. Repeat above with cold water faucet.

12. Product Discharge Add water to kettle. Check for leaks from valve. Open and close valve a few times

Valve

and check for leaks again.

QUALITY ASSURANCE

CHECKLIST

Follow this list only after all other installation steps are completed.
Some steps require the use of equipment. Follow operating instructions.

Advertising