EFCO S5500 SSG Captured User Manual
Page 41

EFCO CORPORATION 6/2012
PART NO. Y556
Page 41 of 81
S-5500 SSG and Captured Corner Mullion Installation Instructions
Section VI: Glazing Preparation (SSG)
STEP #4 INSTALL ADAPTERS AND PRESET GASKETS
Install the glazing adapters and preset gaskets as required. Install glazing as required. Refer to
“Section VIII: Glazing Preparation” and “Section IX Glazing Installation” beginning on page 49 of
the Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions.
STEP #3 APPLY GLAZING TAPE TO CORNER MULLION
A. Clean all surfaces (and apply primer if necessary) of the glazing adapter that will
contact sealant per the sealant manufacturer’s application instructions.
B. Apply the glazing tape as shown below. Refer to the approved shop drawings for part
numbers and other job specific information.
CORNER
MULLIONS
SSG CORNER
MULLION GLAZING
ADAPTER
GLAZING
TAPE