EFCO S5500 SSG Captured User Manual
Page 44

EFCO CORPORATION 6/2012
PART NO. Y556
Page 44 of 81
S-5500 SSG and Captured Corner Mullion Installation Instructions
Section VII: Glazing Preparation
(Vertical SSG and Captured Horizontal)
CAPTURED INTERMEDIATE
HORIZONTALS AT SSG CORNER
CORNER
MULLIONS
CAPTURED
INTERMEDIATE
HORIZONTAL
CAPTURED
INTERMEDIATE
HORIZONTAL
SSG CORNER
MULLION GLAZING
ADAPTERS
STEP #2 SET AND ATTACH CORNER MULLION GLAZING ADAPTER
A. Apply sealant to the bottom end of the corner mullion glazing adapter.
B. Insert the end of the corner mullion glazing adapter as shown in the detail below.
C. Fill all voids completely, and tool the sealant smooth on the bottom end of the corner
mullion glazing adapter.
D. Attach the glazing adapter to the corner mullion with the required fasteners.
E. Cap seal the fastener heads at all fastener penetrations.