EFCO S5500 SSG Captured User Manual

Page 69

Advertising
background image


EFCO CORPORATION 6/2012

PART NO. Y556

Page 69 of 81

S-5500 SSG and Captured Corner Mullion Installation Instructions

Section X: Vertical Splice Joints

Installation for SSG System




STEP #2 ATTACH MULLION SPLICE SLEEVES

A. Clean all surfaces that will contact sealant per the sealant manufacturer’s instructions

making sure to remove all oils and debris from contact surfaces.

B. Apply bond breaker tape to the corner mullion splice sleeve.

C. Install the lower section of the corner frames as instructed in previous sections.

D. For standard installation, attach the mullion splice sleeve to the top of the lower mullion

with splice sleeve attachment screws. Cap seal the fastener heads.

MULLION SPLICE SLEEVE

BOND BREAKER TAPE

SPLICE ATTACHMENT

SCREWS (cap seal)

LOWER 2-PIECE

CORNER MULLION

LOWER 2-PIECE

CORNER MULLION

Advertising