Apply sealant to the subsill as shown in
Figure 11. Place the subsill into the rough
opening, and rotate the exterior face down
into position. Apply enough sealant to
ensure a complete seal as shown in
Figure 12.
Wipe off any excess sealant from the exterior of the subsill.