Drilling template for captured mullions, Fabrication, A. drilling template – EFCO 945 Series User Manual
Page 7: Page 5
Advertising

A C
C
A
B C
RH
B
A
C
A C
LH
A C
C
A
LH
RH
B C
B
A
C
A C
A C
C
A
B
B C
RH
LH
A
B
A C
B C
C
A
B
RH
LH
B C
B
C
USE SIDE #2 OF JIG FOR FABRICATION
OF CAPTURED MULLIONS.
USE THE INTERIOR SIDE OF THE GLASS
POCKET EDGE TO ALIGN JIG. MAKE
SURE THAT THE FABRICATION HOLES
ARE IN THE CORRECT POSITION BEFORE
DRILLING.
A C
F945
DJO4
(2)
#2 DRILL
A
A C
B C
F945
DJO4
(2)
#2 DRILL
C
B C
F945
DJO4
(2)
#2 DRILL
B
A = SILL HOLE LOCATIONS
B = HEAD AND INTERMEDIATE
HORIZONTAL HOLE
LOCATIONS
C = BLIND PASS HORIZONTAL
HOLE LOCATIONS
8344
BAB 11/2000
8302
8301
LEFT HAND STANDARD INT. VERTICAL (8308) SHOWN. RIGHT HAND OPPOSITE.
SECTION III A - DRILLING TEMPLATE FOR
CAPTURED MULLIONS
B C
F945
DJO4
(2)
#2 DRILL
B
8300
PAGE 5
A
C
A C
F945
DJO4
(2)
#2 DRILL
A C
B C
LH
B C
RH
C
B
A
B
Advertising