Frame-install-anchors-inside-glz, Inside glaze frame installation, Interior – Oldcastle BuildingEnvelope FG-2000 User Manual

Page 20

Advertising
background image

INSIDE GLAZE FRAME INSTALLATION

FG-2122X4" LONG

(PART SOLD IN STOCK LENGTHS)

FG-2188

PVC PROFILE

USED TO IMPROVE

INSTALLATION OF

BACKER ROD AND

PERIMETER SEALANT.

(OPTIONAL)

ACCESS HOLE

(SIZE DETERMIMED BY ANCHOR.)

INTERIOR

CLEAR HOLE

(SIZE DETERMIMED BY ANCHOR.)

FG-2000-FP-1

PART #: 7943

1/4" DIA. WEEP HOLE

C OF MULLIONS

L

ANCHOR SIZE AND FREQUENCY SHOULD BE DETERMINED BY STRUCTURAL REQUIREMENTS.

SILL ANCHORS FG-2000-FP-1 AND HEAD ANCHORS FG-2122 SHOULD BE

THE ANCHOR IS NOT MORE THAN 4" FROM EACH SIDE OF THE MULLION.

LOCATED SO THAT

F G - 1 0 0 0 - F G - 2 0 0 0 S T O R E F R O N T I N S T A L L A T I O N M A N U A L

Phone: 1-866-OLDCASTLE (653-2278)

Web Address: www.oldcastlebe.com

19

FEBRUARY 2012

SEALANT

Advertising
This manual is related to the following products: