Т³гж 16, 15 installation instructions – Pridiom Condenser Installation Manual User Manual
Page 16
15
INSTALLATION INSTRUCTIONS
1.5m~2m
VP30
Fig.37
Fig.38
Fig.39
Fig.40
Fig.41
CAUTION
Refer to the figures on the right for the installation
of pipes.
The drain pipe as well as the connection part of
indoor unit must be heat insulated, or condensate
will occur.
Please connect the pipe with horny PVC bond
and make sure there is no leakage.
Do not impose the pressure on connecting
part of drainpipe.
The gradient downwards of drain pipe should be
over 1/100, and do not bend the drain pipe.
Pull the drain pipe transversely within 20m. Please
install a supporter in case the drainpipe is very
long to prevent it from bending.
Lean Downward over 1/100
Supporting Unit
Fold
Bend
Lean Downward
over 1/100
As long as possible (10cm)
Name
Qty.
Outline/specification
Function
Duct installation
board
8
Connecting duct
Fixation bolt (fixing
installation board)
8
ST3.9
10-F-H
Fixing duct
installation board
Instructions for duct installation accessories
Duct design
Fix installation board
Make the duct as short as possible due to the
low static pressure (nearly 0 pa) of this unit.
Fix the installation board on duct outlet with
the bolts in accessories. If the bolt is
self-provided, the length of bolt should be
appropriate and make sure not to damage the
inside of unit. See Fig.30
Duct installation
Fix the duct on installation board with rivet.
See Fig.41.
NOTE:
1.Do not let the indoor unit bear the weight of duct.
2.For convenient maintenance, install the duct
at the place where it is easy to do removing.
3.In case doing installation in meeting room or
such places, please equip the interior with
liner and muffler.
4.These accessories are optional. Please contact
the service for other requirement.
Accessories