Т³гж 16, 15 installation instructions – Pridiom Condenser Installation Manual User Manual

Page 16

Advertising
background image

15

INSTALLATION INSTRUCTIONS

1.5m~2m

VP30

Fig.37

Fig.38

Fig.39

Fig.40

Fig.41

CAUTION

Refer to the figures on the right for the installation
of pipes.


The drain pipe as well as the connection part of
indoor unit must be heat insulated, or condensate
will occur.

Please connect the pipe with horny PVC bond
and make sure there is no leakage.

Do not impose the pressure on connecting
part of drainpipe.
The gradient downwards of drain pipe should be
over 1/100, and do not bend the drain pipe.

Pull the drain pipe transversely within 20m. Please
install a supporter in case the drainpipe is very
long to prevent it from bending.

Lean Downward over 1/100

Supporting Unit

Fold

Bend

Lean Downward
over 1/100

As long as possible (10cm)

Name

Qty.

Outline/specification

Function

Duct installation

board

8

Connecting duct

Fixation bolt (fixing

installation board)

8

ST3.9

10-F-H

Fixing duct

installation board

Instructions for duct installation accessories

Duct design

Fix installation board

Make the duct as short as possible due to the
low static pressure (nearly 0 pa) of this unit.

Fix the installation board on duct outlet with
the bolts in accessories. If the bolt is
self-provided, the length of bolt should be
appropriate and make sure not to damage the
inside of unit. See Fig.30

Duct installation
Fix the duct on installation board with rivet.
See Fig.41.
NOTE:
1.Do not let the indoor unit bear the weight of duct.
2.For convenient maintenance, install the duct
at the place where it is easy to do removing.
3.In case doing installation in meeting room or
such places, please equip the interior with
liner and muffler.
4.These accessories are optional. Please contact
the service for other requirement.

Accessories

Advertising