ELECTRICAL WORK

Bar

Copper pipe

Clamp handle

Red arrow mark

Cone

Yoke

Handle

Bar

"A

"

Fig.50

D: Flaring work

Firmly hold copper pipe in a die in the
dimension shown in the table below.

Caution

Align the center of the pipes.
Sufficiently tighten the flare
nut with fingers, and then tighten
it with a spanner and torque wrench
as shown in Fig.51 & 52.

Tightening Connection

Excessive torque can break nut
depending on installation conditions.

Outer

diam.

Tightening

torque(N.cm)

Additional tightening

torque(N.cm)

6.35

1570

(160kgf.cm)

1960

(200kgf.cm)

4900

(500kgf.cm)

5390

(550kgf.cm)

12.7

Outer diam.

(mm)

A(mm)

Max.

Min.

6.35

1.3

0.7

9.53

1.6

1.0

12.7

1.8

1.0

9.53

2940

(300kgf.cm)

3430

(350kgf.cm)

Fig.52

Indoor unit tubing

Flare nut

Pipings

Fig.51

Electric safety regulations for the initial Installation
1. If there is serious safety problem about the power supply, the technicians should refuse
to install the air conditioner and explain to the client until the problem is solved.
2. Power voltage should be in the range of 90%~110%of rated voltage.
3. The creepage protector and main power switch with a 1.5 times capacity of Max. Current
of the unit should be installed in power circuit.
4. Ensure the air conditioner is grounded well.


7. An individual branch circuit and single receptacle used only for this air conditioner must be available.

5. According to the attached Electrical Connection Diagram located on the panel of the outdoor

unit to connect the wire.

6. All wiring must comply with local and national electrical codes and be installed

by qualified and skilled electricians.