Perform the electric safe check after
completing installation:
1. Insulated resistance
The insulated resistance must be more than
2M

.

2. Grounding work
After finishing grounding work, measure the
grounding resistance by visual detection and
grounding resistance tester. Make sure the
grounding resistance is less than 4

.

3. Electrical leakage check (performing during
test running)
During test operation after finishing installation,
the serviceman can use the electroprobe and
multimeter to perform the electrical leakage
check. Turn off the unit immediately if leakage
happens. Check and find out the solution
ways till the unit operate properly.

A: Lo packed valve B: Hi packed valve
C and D are ends of indoor unit connection.

CAUTION

Electrical safety check

Gas leak check

1. Soap water method:
Apply a soap water or a liquid neutral
detergent on the indoor unit connection
or outdoor unit connections by a soft
brush to check for leakage of the
connecting points of th piping. If bubbles
come out, the pipes have leakage.

2. Leak detector

Use the leak detector to check for leakage.

Safety and leakage check

15

Indoor unit
check point

Outdoor unit
check point

n

m k

j i h

A

B

C

a

c

b

d

e

f

a,b,c,d,h,i,j , k are points for one-two type.
a,b,c,d,e,f,,h,i,j,k,m,n are points for one-three type.

Indoor unit
check point

Outdoor unit
check point

One-four type

30

AIR PURGING

Fig.63

Fig.64

NOTE: The illustration is for explanation
purpose only. The actual order of A, B, C
and D on the machine may be slightly
different from the unit you purchased. The
actual shape shall prevail.