1. A) Attach template to the rim joist in between the floor joists ensuring that it is snug against the subfloor and joist that IN-FORCER

will be mounted to, (See Diagram B). If unit is to be installed on floor trusses, the template should be adjusted to compensate
for the thickness of the added plywood as described in truss mounting section below, (See Diagram C).

B) If IN-FORCER is not being installed between floor joists or trusses, attach the template to the wall it will be exiting, ensuring

IN-FORCER will be level.

2. Using 1/2” bit, drill pilot holes noted on the template from inside through rim joist, wall board, siding, etc., keeping drill bit

perpendicular to the wall. 1/2” bit must be long enough to penetrate through exterior.

3. Remove template from rim joist and attach to building exterior, aligning pilot hole markings on template with holes previously

created in Step #2.

4. Using 3-1/2” hole saw or a reciprocating saw and appropriate blade, cut opening through rim joist, wall board, siding, etc., following

the template outline for the pipe, (See Diagram D).

5. Knock out material exposing hole through the wall.

TRUSS MOUNTING

If IN-FORCER will be mounted on a floor truss instead of a joist follow this section, otherwise, skip to installation of IN-FORCER.
1. Cut a piece of plywood measuring 22” x 9”.
2. Position 22” side of plywood flush against sub floor.
3. Secure plywood to trusses with a minimum of 4-8 penny nails or 1-1/2” wood screws.

INSTALLATION OF IN-FORCER

A minimum two foot length of PVC intake pipe is recommended so the IN-FORCER can be easily serviced. If intake PVC pipe
lengths are relatively short, the pipe can be cemented to the IN-FORCER coupler and fed through exterior opening before securing to
the wall. If PVC pipe run is extended, first secure IN-FORCER to joist/truss, then extend PVC pipe run through exterior opening and
cement to PVC coupler.

Note: Before cutting opening through wall, consider layout of PVC pipe runs and consult performance charts on page 4 to make sure
CFM necessary for equipment is achieved with pipe run lengths.

1. Assemble vibration mount brackets on IN-FORCER as shown below in diagram E.

5

DIAGRAM B

DIAGRAM C

DIAGRAM D

DIAGRAM E