Height control box installation, 19 height control box installation – Vinten Radamec Fusion FPR-210 User Manual

Page 21

Advertising
background image

Operators guide

19

Height control box installation

If the optional accessory height control box (V3952-1910) is to be installed, proceed as follows:

1.

Using the cable tie provided, install the height control box onto a pan bar or the
pedestal steering ring (convenient location for the operator).

2.

Connect the supplied link cable to the height control box.

Fig. 10 Height control box installation

Fig. 11 Link cable connection

Advertising