Welch Allyn LS200 Procedure Light - User Manual User Manual

Page 14

Advertising
background image

8

Chapter 2 Mounting and Operating Instructions

Welch Allyn LS200 Procedure Light

5. Place wall plate

on wall and drive
top 1.5" (3.8cm)
wood screw
halfway into
wood stud.

6. Align wall plate

using a level and
secure at bottom
with 1.5" (3.8cm)
wood screw.

7. Tighten top wood

screw.

8. Prepare for transformer mounting by following “Mounting The

Transformer” on page 11 instructions through step 4.

9. Carefully remove LS200 arm/luminaire assembly from box.

Complete transformer mounting according to steps 5 and 6 of
instructions on

page 11

.

10. Place arm/luminaire assembly on

extension arm by sliding universal
connector (B) onto extension arm
(G) and aligning screw holes.

11. Insert 0.5" (13mm) flathead

screw (b) into hole on side of
universal connector and tighten.
Move arm up and down to check
that mounting is secure.

12. Push cord into clips in underside

of extension arm.

Advertising